About Us
Professional Tubing Inspection & Pipe Handling
Minimizing Risk. Maximizing Production.
At JEC Tubing Testers, we provide a full suite of tubing inspection and specialized handling services designed to ensure the structural integrity of your downhole assets. We understand that every hour of downtime is a lost opportunity, which is why our services are engineered for both accuracy and operational speed.
We specialize in mobile, on-site solutions for tubing sizes ranging from 2-3/8″ through 5-1/2″, serving a wide variety of well completions and workover operations.
Our Core Service Categories
We specialize in a suite of essential wellsite services tailored to the specific needs of modern production and intervention:
EMI Tubing Scanning
Our Electromagnetic Induction (EMI) scanning is the industry standard for identifying internal and external flaws, pits, and wall loss. We offer specialized configurations to meet your specific completion type:
- Standard Scanning: High-speed flaw detection for production tubing.
- Specialized Scanning: Specialized “With Cable & Cap” services for ESP, CT Line, and Gas Lift applications.
Hydrostatic Testing
Verification of joint and body integrity under pressure is vital before a string goes into the hole. Our hydrostatic testing services provide real-time validation for tubing sizes 2-3/8″ to 5-1/2″, ensuring your well remains leak-free under maximum operating pressures.
Laydown Machine Services
Safety and efficiency are paramount during pipe movement. Our hydraulic laydown machines, equipped with precision pipe grabbers, eliminate manual handling risks and protect the threads and bodies of your tubing during pickup and laydown operations.
Why JEC Sets the Standard
When you choose JEC for your tubing inspection needs, you are choosing a partner committed to technical precision. Our equipment is regularly calibrated, and our operators are trained to recognize the subtle indicators of pipe fatigue that others might miss.
By identifying “bad joints” on the surface, we save our clients significant costs in premature workovers and environmental remediation.


